PMC Midlands Case Studies

9M Motorsport, Cheshire

9M’s workshop had a high roof that was not energy efficient. PMC Midlands constructed a suspended ceiling using an under purling lining, insulated with rock wool and a vapour barrier which reduced heating costs.

The outside of the building was modernised with cladding and flashing to improve the overall aesthetic appearance.

Left
Above: New suspended ceiling which reduced heating costs.
Below: Workshop with high, uninsulated ceiling.

Right
Above: The outside of the building was modernised.
Below: Workshop building in need of renovation.


Return to List of Case Studies