PMC Midlands Case StudiesChallenger Tyres, WolverhamptonPMC Midlands designed and erected a new triple portal building to replace fire damaged warehousing.
The existing site was cleared of all fire debris and all civils work was carried out.
The building was constructed of half height brickwork with external cladding and coloured flashing, and internally fitted with insulation and under purling lining.
The existing building was modernised in matching external cladding.
Left
Above: The completed Challenger Tyres building.
Below: Fitting insulation and under purling lining.
Right:
Above: Preparing the fire damaged site before building.
Below: Steelwork in progress.
Return to List of Case Studies
|