Connect Distribution, Birmingham – Gas House & Distribution Office
As part of PMC Midlands on-going redevelopment and expansion of Connect Distribution's facilities in Birmingham, the brick gas house has been demolished as it was falling down due to subsidence and has been replaced with a steel frame building.
All groundwork was carried out to rectify subsidence issues, including laying new drainage and sewerage pipework and pump.
In addition a distribution office / customer pick-up point has been built to improve the national distribution centre’s customer facilities.
Both buildings have been constructed of steel portal frame with Micro-Rib composite panels fitted, in keeping with the existing site development and to meet the latest building regulations.
Image:
On the left of the photograph is the replaced Gas House and on the right the new distribution office/pick up point. A substantial amount of groundwork was required and the thru-way and parking areas have been resurfaced.

PMC Services
Talk to us about your project
Send us the details of your project and we'll get back to you