Projects
Banner Image

Saddlers Court Manufacturing Ltd, Walsall

The design and build of a two-storey office block extension to the existing premises of an industrial metal fabrication business.

PMC Midlands designed and built a steel frame extension with a mezzanine floor to maximize available space. The new build was fitted out to provide quality office facilities.

The steel frame portal building was constructed and insulated with composite Micro-Rib panel cladding for energy-efficiency and to meet the latest building regulations.

The existing industrial unit was refurbished in matching Micro-Rib panel cladding to modernise the building and improve energy efficiency.

1st Image:
Steel frame extension ready for cladding.

2nd Image:
Internal offices being constructed.

3rd Image:
Before work began on the extension.

4th Image:
Completed office block

Steel frame extension ready for cladding
Internal offices being constructed
Before work began on the extension
Completed office block

PMC Services

Talk to us about your project

Send us the details of your project and we'll get back to you