Below are a list of PMC Midlands projects that include steel frame portal buildings and industrial/commercial steelwork.
|
|
|
|
|
Connect Distribution, Birmingham
PMC Midlands constructed a 13 metre to eaves steel frame warehouse to further expand Connect Distribution's facilities.
View Details |
|
|
|
|
|
The Electrolytic Plating Co. Ltd. (EPC), Walsall
Design and build of replacement 1,500 sq/m steel frame portal building for electroplating treatment plant and office block.
View Details |
|
|
|
|
|
Saddlers Court Manufacturing Ltd, Walsall
The design and build of a two-storey office block extension and refurbishment of an existing industrial unit.
View Details |
|
|
|
|
|
Automotech Services Limited, Rugeley, Staffordshire
PMC Midlands designed and built a large two-storey warehouse extension with offices to the existing industrial unit of Automotech, vehicle lift specialists.
View Details |
|
|
|
|
|
Connect Distribution, Birmingham – Gas House & Distribution Office
As part of the on-going redevelopment of Connect Distribution's facilities, the gas house has been replaced and a distribution office has been built.
View Details |
|
|
|
|
|
Aston Marina Ltd, Staffordshire
The design and build of shop and office complex on the new Aston Marina site.
View Details |
|
|
|
|
|
Epsom Coaches Group, Surrey
Redevelopment of Epsom Coaches Vehicle Valet Centre
View Details |
|
|
|
|
|
Epsom Coaches Group, Surrey
Redevelopment of Epsom Coaches Group fleet shelter and facilities.
View Details |
|
|
|
|
|
Devonshire Developments, Letchworth
Development of commercial units through refurbishment of existing buildings and construction of extension and concrete mezzanine floor.
View Details |
|
|
|
|
|
Connect Distribution, Birmingham
Construction of new warehouse at Connect Distribution
View Details |
|
|
|
|
|
Asquith Butler, Brighouse
Design & build of new warehouse facilities with office space and refurbishment of existing buildings.
View Details |
|
|
|
|
|
Bermer Place, Imperial Way Ind Estate, Watford
Build of nine executive, air conditioned light industrial units
View Details |
|
|
|
|
|
Connect Distribution, Birmingham
Further warehousing and storage facilities for Connect Distribution
View Details |
|
|
|
|
|
Classic Car Storage Facility, Wales
The design and build of a dry and condensation free storage unit
View Details |
|
|
|
|
|
Asquith Butler, Brighouse
The design and build of steel frame manufacturing facility
View Details |
|
|
|
|
|
911virgin.com, Buckinghamshire
PMC Midlands designed and built new steel frame secure storage facilities for 911virgin.com.
View Details |
|
|
|
|
|
Connect Distribution, Birmingham
To build a new warehouse using steel frame with insulated composite panel cladding.
View Details |
|
|
|
|
|
Hepworth Building Products, Derbyshire
To design and build a new kiln and drying room at Hepworth Building Products, working in conjunction with Briseco to prepare specialist groundwork.
View Details |
|
|
|
|
|
Wilnecote Brick, for Tarmac Central
PMC Midlands designed & built an extension to existing buildings to house new kiln and drying room at Wilnecote Brick.
View Details |
|
|
|
|
|
Little Bells Nursery & Children's Centre, Birmingham
PMC Midlands designed and built the curved steel framework required by Little Bells Nursery, along with designing a roofing system to meet a specified ‘U’ value.
View Details |
|
|
|
|
|
School canopies
To design and build canopies onto existing school buildings.
View Details |
|
|
|
|
|
Mead Industrial Estate, Hertfordshire
The design and build of office and warehousing space, suitable for business leasing.
View Details |
|
|
|
|
|
Kauffmanns Nuts, London
To design and build new office, warehouse and goods inward facilities; with internal lining to meet food hygiene industry standards.
View Details |
|
|
|
|
|
Key Business Park, Birmingham
The design and build of long warehouse/office space, constructed into separate multiples of 1,000 Sq ft units suitable for business leasing.
View Details |
|
|
|
|
|
Challenger Tyres, Wolverhampton
To design and erect a new triple portal building on fire damaged site and cladding of adjacent building to match.
View Details |
|
|
|